Updating offshore wind turbines: New designs require addressing problems at smaller scales, say scientists

The U.S. is ramping up plans for a major increase in offshore wind production, with 30 gigawatts of new installations expected by 2030 and a total of 110 gigawatts by 2050. But to be successful, the country needs to design turbines that can withstand the challenges of tropical storms.

This article is brought to you by this site.

Skip The Dishes Referral Code